Resources

The vocabulary of the line, and what a pilot needs.

A glossary of the defects and process terms Draweon's agents work with, the standards the reasoning layer cites, and the inputs a plant brings to a pilot baseline. No white papers or calculators are published yet; this page is the reference we actually have.

12 terms4 standards familiesPilot baseline inputs

Standards the reasoning layer cites
  • UL: wire and cable product standards
  • IEC: international cable and conductor standards
  • IPC: cable and harness assembly standards
  • USCAR: automotive wiring standards
  • Your construction specs, draw schedules and quality procedures

Retrieval is tenant-isolated and every answer carries its citation.

Glossary

Twelve terms

The defects and process terms that appear throughout the site.

Glossary

Eccentricity

The conductor sitting off-centre inside the insulation, so one side of the wall is thin. A dielectric weak spot and a spark-test risk.

Glossary

Concentricity

How centred the conductor is in the wall, usually the ratio of minimum to maximum wall. Extrio holds it; Eddix measures and predicts it.

Glossary

Neckdown

A local thinning of the insulation or the conductor. On extrusion it follows a melt-pressure or speed step; on drawing it precedes a break.

Glossary

Lump

A local thickening of the insulation, often from contamination or a melt surge. Caught by laser gauge and cameras.

Glossary

Spark fault

A breakdown of the insulation under the spark tester's voltage. The fault exists before the tester finds it, which is what Eddix predicts.

Glossary

Pinhole

A tiny void or hole through the insulation. A field-escape risk that rarely shows in a diameter trace.

Glossary

Birdcaging

Strands separating and bulging out of a stranded conductor, from tension or lay faults. Cablyn predicts and prevents it.

Glossary

Lay length

The distance along the conductor for one full twist of a strand. It decides flexibility, diameter and electrical behaviour.

Glossary

Give-away

Polymer or copper used beyond nominal to stay safely above the minimum. Money the plant pays for margin it could hold with better control.

Glossary

Die wear

The gradual opening of a drawing die. It changes diameter and tension and raises break risk until the die is changed.

Glossary

Genealogy

The record of a reel: conductor lot, draw and anneal record, lay, wall trace, defect map, approvals and release decision.

Glossary

Takt

The pace the line must hold to meet the order plan. Yield-and-Takt balances it against downstream capacity and energy.

Pilot baseline

What a plant brings to the first meeting

The inputs for a baseline agreed in writing.

About the line

  • Line type and the constructions it runs
  • Controllers, gauges, testers and cameras installed, with interfaces
  • MES or quality system and how reels are recorded
  • Shift pattern and who approves process changes

About the losses

  • Breaks per shift and minutes lost per break
  • Give-away as a percentage of nominal
  • Spark faults, downgrade and reject metres per month
  • Energy per reel
  • Changeover time and ramp scrap per construction change
Reading

Where to go next

The pages that explain the mechanics.

Platform

Six layers, one loop

How the plant-edge runtime, orchestrator, agents, twin and cloud loop fit together.

Security

How software is allowed to touch a line

The write path, the audit record and the data governance.

Scenarios

Three labelled walk-throughs

What a pilot on extrusion, drawing or inspection would do and measure.

Blog

Writing on cable making and autonomy

Why the line still runs on feel, autonomy as a dial, hit spec before the first metre.

Developers

Typed tools, declared limits

The SDK and CLI design previews.

Pricing

Per line, per plant, per group

Tiers, the comparison table and the arithmetic a plant runs.

Run timeline · scenario

One scenario run, step by step

Every Draweon run is an ordered, inspectable sequence. This is run_3d7a1e on EX-3 · 2.5 mm² class 2 PVC building wire. Scenario completes in 10 steps with one approval gate. Wall settles at 0.80 mm nominal, minimum 0.66 mm, concentricity 0.93, no spark faults, reel R-30417 released with full genealogy.

run_3d7a1e EX-3 · 2.5 mm² class 2 PVC building wire illustrative scenario SUCCEEDED
  1. 01 ingest.order SUCCEEDED 0.6 s

    Plant Orchestrator · Pulled the construction spec for 2.5 mm² class 2 PVC building wire from MES: 7 × 0.67 mm conductor, 0.80 mm nominal wall, 0.62 mm minimum spot wall, 6 kV spark test, 48 km order. Locked the target envelope.

  2. 02 twin.simulate SUCCEEDED 41 s

    Line Twin · Simulated 36 candidate recipes on the as-run line twin for draw schedule, lay length and extrusion setpoints, ranked on wall variance, concentricity, predicted spark risk and polymer give-away.

  3. 03 draw.tension SUCCEEDED 1 m 48 s

    Draw-and-Anneal · Capstan tension on RB1 stepped down 6% as the die-wear estimate crossed its threshold. Diameter held at 0.670 mm ± 0.004 mm and the break-risk score fell from 0.31 to 0.09.

  4. 04 anneal.current SUCCEEDED 54 s

    Draw-and-Anneal · Annealer current trimmed against the live conductivity reading to hold the softness target without over-anneal through the speed change.

  5. 05 strand.lay SUCCEEDED 1 m 12 s

    Strand-and-Cable · Lay length set to 28 mm on bunching line ST2 with payoff tension balanced across 7 spools. Roundness index held above 0.97 into the extrusion payoff.

  6. 06 extrude.wall SUCCEEDED 2 m 36 s

    Insulate-and-Jacket · Screw speed and zone 3 temperature re-cut against melt pressure and material-lot moisture. Wall settled at 0.80 mm nominal, minimum 0.66 mm, concentricity 0.93.

  7. 07 inspect.fuse SUCCEEDED continuous

    Defect-and-Inspect · 6 cameras, the laser gauge, the eddy-current head and the spark tester fused at the edge. One neckdown precursor at 12,480 m flagged and cleared by a screw-speed trim before it reached the reel.

  8. 08 approve.human APPROVAL 38 s

    Plant Orchestrator · Line-speed ramp 1,100 to 1,250 m/min exceeded the site autonomy threshold. Held for the shift process engineer and approved at 06:41:52.

  9. 09 reel.change SUCCEEDED 2 m 05 s

    Robot-and-Handling · Reel change on take-up TU3 planned and executed by the handling robot. Payoff aligned and tension re-established inside the changeover window.

  10. 10 reel.release SUCCEEDED 1 m 10 s

    Quality-and-Conformance · Reel R-30417 released: genealogy written (conductor lot, draw and anneal record, lay, wall and concentricity trace, defect map, approvals) and checked against the construction spec.

Autonomy

Four levels, set per agent and per tag

A plant does not go from manual to unattended in one step. Draweon makes the level explicit, auditable and reversible at any time. The first release runs shadow mode, then assist mode, then graduated autonomy.

Autonomy levels and the human role at each
LevelWhat the agent doesWhat the human doesWhere it sits in a pilot
L1 · AdvisoryRecommends setpoints and explains why, with citationsEnters every change manuallyShadow mode, weeks 1 to 3
L2 · SupervisedProposes a write; it executes on approvalApproves each write in the review consoleAssist mode, weeks 4 to 8
L3 · BoundedWrites inside tag, rate and magnitude limitsApproves ramps, die changes and reel releaseGraduated autonomy, from week 9 if the plant is satisfied
L4 · UnattendedRuns the envelope without promptingSets the envelope; reviews the shift recordPlanned; after qualification on the construction
Accelerated computing

Physical AI, at the die train

Conductor moves at over a thousand metres a minute. Perception has to be local, deterministic and fast, so Draweon runs GPU inference at the plant edge and keeps training, simulation and optimisation in the cloud or on-prem.

Jetson Orin · DeepStream · Holoscan · TensorRT

Edge perception

4 to 12 cameras per line plus laser, eddy-current and spark streams fused at the line. Sub-50 ms alerting and sub-250 ms bounded control are the design targets. Jetson Thor is planned for higher sensor density.

Triton · NIM

Model serving

Vision, time-series, anomaly and quality models behind one orchestrator at the plant edge, with canary rollout by line and fallback to the previous validated version.

DGX or HGX · NeMo

Training

Defect classifiers, sensor-fusion models, time-series prognostics and cable-process reasoning models trained on reel telemetry and engineer corrections. Dedicated training capacity is planned.

Omniverse · OVX · Modulus

Line twin

As-run drawing, stranding, extrusion, thermal and tension simulation. Physics-informed surrogates are planned so recipes can be optimised at production cadence.

Cosmos · Omniverse Replicator

Synthetic data

Rare spark, pinhole, eccentricity, neckdown and break variants generated and validated against real gauge, spark and vision distributions before promotion. Planned.

cuOpt

Optimisation

Line sequencing, reel changeovers, energy allocation, takt and constrained setpoint proposals.

Isaac · Isaac Sim

Robot handling

Spool, reel and payoff and take-up motion planned and validated in simulation before it runs next to moving conductor.

FAQ

Straight answers

The questions plant directors and process engineers ask in the first meeting.

Yes, but only within an explicit tag allow-list with per-tag rate and magnitude limits, and only at the autonomy level your plant has set. Level 1 is advisory: Draweon recommends and a human enters everything. Design partners start there, in shadow mode, before supervised writes.

Get started

Bring the inputs, we bring the baseline

Start with one drawing, stranding or extrusion line and one measurable baseline. A paid pilot on wall and concentricity, break prediction or spark prediction shows the number before you commit further.