Founding edge perception engineer
Jetson Orin, DeepStream, Holoscan, TensorRT. Fuse cameras, laser, eddy-current and spark streams into one model of cable health at line speed.
Draweon is pre-launch and building its founding team. The four roles below are the ones we expect to open first, written as honestly as we can about the stage: there is no office to show, no customer list, and the first job is a paid pilot on one line.
Illustrative scenario: EX-3 · 2.5 mm² class 2 PVC building wire, changeover, no spark faults
Role descriptions, not an openings count. Each is a founding role.
Jetson Orin, DeepStream, Holoscan, TensorRT. Fuse cameras, laser, eddy-current and spark streams into one model of cable health at line speed.
PLC and SCADA connectors on drawing, stranding and extrusion lines. Guarded writes, interlocks, rollback and the audit log.
Omniverse line twin, extrusion CFD and thermal, drawing and stranding dynamics, physics-informed surrogates, cuOpt.
Someone who has run a drawing or extrusion line. Translate drawer and extrusion craft into process windows, metrics and acceptance tests for design partners.
We measure ourselves on breaks, give-away, spark faults and energy per reel, the plant's own numbers.
A design target is called a design target. A scenario is called a scenario. We do not round up.
The policy engine, approvals and the audit log are the product, not overhead.
A move is rehearsed on the twin before it is written. So are our own changes.
Every decision, every run, every correction goes into a record someone else can read.
The craft we are encoding lives on the floor. We go there.
Every Draweon run is an ordered, inspectable sequence. This is run_3d7a1e on EX-3 · 2.5 mm² class 2 PVC building wire. Scenario completes in 10 steps with one approval gate. Wall settles at 0.80 mm nominal, minimum 0.66 mm, concentricity 0.93, no spark faults, reel R-30417 released with full genealogy.
Plant Orchestrator · Pulled the construction spec for 2.5 mm² class 2 PVC building wire from MES: 7 × 0.67 mm conductor, 0.80 mm nominal wall, 0.62 mm minimum spot wall, 6 kV spark test, 48 km order. Locked the target envelope.
Line Twin · Simulated 36 candidate recipes on the as-run line twin for draw schedule, lay length and extrusion setpoints, ranked on wall variance, concentricity, predicted spark risk and polymer give-away.
Draw-and-Anneal · Capstan tension on RB1 stepped down 6% as the die-wear estimate crossed its threshold. Diameter held at 0.670 mm ± 0.004 mm and the break-risk score fell from 0.31 to 0.09.
Draw-and-Anneal · Annealer current trimmed against the live conductivity reading to hold the softness target without over-anneal through the speed change.
Strand-and-Cable · Lay length set to 28 mm on bunching line ST2 with payoff tension balanced across 7 spools. Roundness index held above 0.97 into the extrusion payoff.
Insulate-and-Jacket · Screw speed and zone 3 temperature re-cut against melt pressure and material-lot moisture. Wall settled at 0.80 mm nominal, minimum 0.66 mm, concentricity 0.93.
Defect-and-Inspect · 6 cameras, the laser gauge, the eddy-current head and the spark tester fused at the edge. One neckdown precursor at 12,480 m flagged and cleared by a screw-speed trim before it reached the reel.
Plant Orchestrator · Line-speed ramp 1,100 to 1,250 m/min exceeded the site autonomy threshold. Held for the shift process engineer and approved at 06:41:52.
Robot-and-Handling · Reel change on take-up TU3 planned and executed by the handling robot. Payoff aligned and tension re-established inside the changeover window.
Quality-and-Conformance · Reel R-30417 released: genealogy written (conductor lot, draw and anneal record, lay, wall and concentricity trace, defect map, approvals) and checked against the construction spec.
Conductor moves at over a thousand metres a minute. Perception has to be local, deterministic and fast, so Draweon runs GPU inference at the plant edge and keeps training, simulation and optimisation in the cloud or on-prem.
4 to 12 cameras per line plus laser, eddy-current and spark streams fused at the line. Sub-50 ms alerting and sub-250 ms bounded control are the design targets. Jetson Thor is planned for higher sensor density.
Vision, time-series, anomaly and quality models behind one orchestrator at the plant edge, with canary rollout by line and fallback to the previous validated version.
Defect classifiers, sensor-fusion models, time-series prognostics and cable-process reasoning models trained on reel telemetry and engineer corrections. Dedicated training capacity is planned.
As-run drawing, stranding, extrusion, thermal and tension simulation. Physics-informed surrogates are planned so recipes can be optimised at production cadence.
Rare spark, pinhole, eccentricity, neckdown and break variants generated and validated against real gauge, spark and vision distributions before promotion. Planned.
Line sequencing, reel changeovers, energy allocation, takt and constrained setpoint proposals.
Spool, reel and payoff and take-up motion planned and validated in simulation before it runs next to moving conductor.
A plant does not go from manual to unattended in one step. Draweon makes the level explicit, auditable and reversible at any time. The first release runs shadow mode, then assist mode, then graduated autonomy.
| Level | What the agent does | What the human does | Where it sits in a pilot |
|---|---|---|---|
| L1 · Advisory | Recommends setpoints and explains why, with citations | Enters every change manually | Shadow mode, weeks 1 to 3 |
| L2 · Supervised | Proposes a write; it executes on approval | Approves each write in the review console | Assist mode, weeks 4 to 8 |
| L3 · Bounded | Writes inside tag, rate and magnitude limits | Approves ramps, die changes and reel release | Graduated autonomy, from week 9 if the plant is satisfied |
| L4 · Unattended | Runs the envelope without prompting | Sets the envelope; reviews the shift record | Planned; after qualification on the construction |
Draweon writes to production equipment. Every capability is scoped, every write is policy-checked, and every action is written to an append-only audit log the plant owns.
| Item | Scope | Status |
|---|---|---|
| SOC 2 Type I | Cloud control plane | QUEUED Planned, first 6 months |
| SOC 2 Type II | Cloud control plane | QUEUED Planned, 6 to 12 months |
| SSO and RBAC | Console and approvals | QUEUED Planned, 6 to 12 months |
| Standards-cited reasoning | UL, IEC, IPC, USCAR documents | RUNNING In the design, every answer cites its source |
| Per-tenant isolation | Recipes, models, memory | RUNNING In the design from day one |
| On-prem and plant-edge deployment | Sensitive producers | RUNNING Design option |
The questions plant directors and process engineers ask in the first meeting.
Yes, but only within an explicit tag allow-list with per-tag rate and magnitude limits, and only at the autonomy level your plant has set. Level 1 is advisory: Draweon recommends and a human enters everything. Design partners start there, in shadow mode, before supervised writes.
Control returns to the line controller's last known-good state. Draweon is a supervisory layer on top of the PLCs and gauges you already run, never a replacement for them, so an outage degrades the line to its current way of running, not to a stop.
Advisory recommendations start from the physics-based twin and the construction spec in the first weeks. Defect prediction and break prediction improve as line history and labelled events accumulate per construction. The first training sets are sized at 5 to 20 million labelled frames and events, a design target.
Only if you choose cloud training. Recipes, process models and defect libraries are isolated per tenant and never used to train another customer's models. A fully on-prem deployment at the plant edge is available for sensitive producers.
You are, the same as with any control strategy, which is why every write is policy-checked, bounded, logged and reversible, and why anything above your risk threshold waits for a named approver. The audit log records the request, the reasoning, the limits applied and the human decision.
A paid pilot on one line, scoped to a single workflow with a baseline agreed in writing. Weeks 1 to 3 are connection and shadow-mode observation, weeks 4 to 8 are assist mode with engineer approval, and bounded autonomy follows if the plant is satisfied with the recommendations.
↑↓ navigate↵ openesc close