Contact

Start with the line that is costing you the most.

Draweon starts with a paid pilot on one drawing, stranding or extrusion line and a baseline agreed in writing. Tell us the line, the metric and the systems on it. We will say plainly whether the wedge fits and what the first ninety days would look like.

hello@draweon.comPaid pilot · one lineReply from the founding team

Tell us about your line

This form opens your mail client addressed to hello@draweon.com. Nothing is stored on this site.

Reasons

Why people get in touch

Pilot

Run a wedge on one line

Wall and concentricity, break prediction or spark prediction, with a metric you already measure.

Partner

Ship Draweon-ready

Machinery OEMs, inspection and MES vendors, integrators.

Security

Send the questionnaire

We answer plainly, including what is planned rather than done.

Careers

Found something

Edge perception, OT integration, simulation, process engineering.

Press and research

Ask a question

On wire drawing, extrusion, inspection and autonomy on the line.

Investors

Pre-seed conversation

Pre-revenue, pre-institutional. We do not claim traction we do not have.

First 90 days

What an engagement looks like

The first-release plan, applied to your line.

  1. Weeks 1 to 3. Connect and observe. Read-only connection to the wedge line, the time-aligned reel record built, the baseline measured from your own records.
  2. Weeks 4 to 8. Assist. Recommendations with evidence in the review console; your engineer approves each one; accuracy and ROI measured against the signed baseline.
  3. Week 9 on. Bounded autonomy, if you are satisfied. Low-risk loops run inside declared limits; ramps, die changes and reel release stay with named humans.
  4. Decision. Convert to the Line tier and expand, or stop with the record of what was measured.
Run timeline · scenario

What we would be deploying

Every Draweon run is an ordered, inspectable sequence. This is run_3d7a1e on EX-3 · 2.5 mm² class 2 PVC building wire. Scenario completes in 10 steps with one approval gate. Wall settles at 0.80 mm nominal, minimum 0.66 mm, concentricity 0.93, no spark faults, reel R-30417 released with full genealogy.

run_3d7a1e EX-3 · 2.5 mm² class 2 PVC building wire illustrative scenario SUCCEEDED
  1. 01 ingest.order SUCCEEDED 0.6 s

    Plant Orchestrator · Pulled the construction spec for 2.5 mm² class 2 PVC building wire from MES: 7 × 0.67 mm conductor, 0.80 mm nominal wall, 0.62 mm minimum spot wall, 6 kV spark test, 48 km order. Locked the target envelope.

  2. 02 twin.simulate SUCCEEDED 41 s

    Line Twin · Simulated 36 candidate recipes on the as-run line twin for draw schedule, lay length and extrusion setpoints, ranked on wall variance, concentricity, predicted spark risk and polymer give-away.

  3. 03 draw.tension SUCCEEDED 1 m 48 s

    Draw-and-Anneal · Capstan tension on RB1 stepped down 6% as the die-wear estimate crossed its threshold. Diameter held at 0.670 mm ± 0.004 mm and the break-risk score fell from 0.31 to 0.09.

  4. 04 anneal.current SUCCEEDED 54 s

    Draw-and-Anneal · Annealer current trimmed against the live conductivity reading to hold the softness target without over-anneal through the speed change.

  5. 05 strand.lay SUCCEEDED 1 m 12 s

    Strand-and-Cable · Lay length set to 28 mm on bunching line ST2 with payoff tension balanced across 7 spools. Roundness index held above 0.97 into the extrusion payoff.

  6. 06 extrude.wall SUCCEEDED 2 m 36 s

    Insulate-and-Jacket · Screw speed and zone 3 temperature re-cut against melt pressure and material-lot moisture. Wall settled at 0.80 mm nominal, minimum 0.66 mm, concentricity 0.93.

  7. 07 inspect.fuse SUCCEEDED continuous

    Defect-and-Inspect · 6 cameras, the laser gauge, the eddy-current head and the spark tester fused at the edge. One neckdown precursor at 12,480 m flagged and cleared by a screw-speed trim before it reached the reel.

  8. 08 approve.human APPROVAL 38 s

    Plant Orchestrator · Line-speed ramp 1,100 to 1,250 m/min exceeded the site autonomy threshold. Held for the shift process engineer and approved at 06:41:52.

  9. 09 reel.change SUCCEEDED 2 m 05 s

    Robot-and-Handling · Reel change on take-up TU3 planned and executed by the handling robot. Payoff aligned and tension re-established inside the changeover window.

  10. 10 reel.release SUCCEEDED 1 m 10 s

    Quality-and-Conformance · Reel R-30417 released: genealogy written (conductor lot, draw and anneal record, lay, wall and concentricity trace, defect map, approvals) and checked against the construction spec.

Pricing

Priced per line, per plant, per group

Land on one workflow with a measured baseline. Expand by line, module and autonomy level. Outcome components are available on yield, scrap, length and energy. Annual prepay carries a 15 to 20% discount.

Line $14,000 per drawing, stranding or extrusion line / month · billed monthly

Drawing or extrusion control, or inspection, for a single line. For cable makers validating ROI on the wedge.

  • One line, one agent module
  • Plant-edge inference node included
  • Line controller and gauge reads, guarded writes
  • Run log, audit trail, reel genealogy
  • Business-hours support
Start a pilot
Enterprise Custom land $650k to $8.5M ACV

Multi-site wire and cable groups standardising on Draweon, with custom conductor, insulation and tolerance models.

  • Multi-site fleet management
  • Custom conductor, insulation and tolerance models
  • Plant edge fleet with on-prem option
  • Group autonomy policy and approval chains
  • SLAs, SSO and RBAC, dedicated engineer
Contact us
Guardrails

An agent that can move a screw speed needs a leash

Draweon writes to production equipment. Every capability is scoped, every write is policy-checked, and every action is written to an append-only audit log the plant owns.

  • Bounded action space. Each agent writes only to an explicit tag allow-list, inside per-tag rate and magnitude limits.
  • Policy engine before every write. Autonomy level, shift, construction, interlock state and operator presence are evaluated before a setpoint moves.
  • Human-in-the-loop gates. Anything above the site threshold, such as line-speed ramps, die changes and reel release, waits for a named approver.
  • Immutable audit log. Append-only and exportable. Every action records source signals, retrieved procedures, predicted impact, allowed range, rollback condition, approver and reel scope.
  • Hard fallback. Loss of the edge node, the network or a model returns control to the line controller's last known-good state.
  • Tenant and IP isolation. Construction recipes, defect libraries and process memory never cross a customer boundary. On-prem deployment is available for sensitive producers.

Compliance posture

Compliance and certification status
ItemScopeStatus
SOC 2 Type ICloud control plane QUEUED Planned, first 6 months
SOC 2 Type IICloud control plane QUEUED Planned, 6 to 12 months
SSO and RBACConsole and approvals QUEUED Planned, 6 to 12 months
Standards-cited reasoningUL, IEC, IPC, USCAR documents RUNNING In the design, every answer cites its source
Per-tenant isolationRecipes, models, memory RUNNING In the design from day one
On-prem and plant-edge deploymentSensitive producers RUNNING Design option

Read the security overview

Integrations

It speaks line, not cloud

Draweon reads and writes through the systems already on the floor. No rip and replace, no parallel historian, no new HMI to learn. Vendor names are examples of systems found on cable lines; connector availability is confirmed per site.

Line control

PLC and SCADA on drawing, stranding and extrusion lines (Siemens, Rockwell and OEM controllers)

Setpoint reads and guarded writes

Diameter and eccentricity

Laser gauges and X-ray wall scanners (Sikora, Zumbach, Beta LaserMike and NDC class systems)

Wall, diameter, eccentricity traces

Eddy-current and spark

Eddy-current heads and spark testers

Fault events with length position

Cameras

Line-scan and area cameras on the line

Frames for lumps, neckdowns, surface faults

Drawing and annealing

Rod breakdown, intermediate and fine drawing, annealers (Niehoff and Properzi class lines)

Tension, die force, annealer current, conductivity

Stranding and cabling

Bunchers, planetary, rigid and tubular stranders (Gauder, Pourtier, Nextrom class lines)

Payoff tension, take-up, lay, geometry

Extrusion

Insulation and jacket lines (Maillefer, Rosendahl Nextrom, Troester, Davis-Standard class lines)

Screw, zones, melt pressure, cooling

MES and quality

Cable MES, quality systems and in-house records

Orders, constructions, reel genealogy

See all integrations

FAQ

Straight answers

The questions plant directors and process engineers ask in the first meeting.

Yes, but only within an explicit tag allow-list with per-tag rate and magnitude limits, and only at the autonomy level your plant has set. Level 1 is advisory: Draweon recommends and a human enters everything. Design partners start there, in shadow mode, before supervised writes.

Get started

Or just send the numbers

Breaks per shift, give-away, spark faults, energy per reel. We will tell you which wedge fits.